Solar Site Prep & Land Clearing

Clear land fast so your solar installation stays on schedule.

Ground-Mount Arrays
Vegetation Management
Access Road Clearing
Meet Interconnection Deadlines

The Challenge Solar Developers Face

Ground-mount solar installations require cleared, level sites with proper access. Delays in site preparation can push back interconnection dates, trigger permit expirations, and cost thousands in lost incentives.

Without Proper Site Prep

  • Overgrown fields delay racking installation
  • Brush and saplings interfere with post driving
  • No access roads for equipment and panel delivery
  • Missed interconnection deadlines = lost revenue
  • Traditional clearing creates debris piles to haul

With Brushworks

  • Clear multi-acre sites in days, not weeks
  • Mulch left behind stabilizes soil and prevents erosion
  • Access roads and staging areas cleared to spec
  • Work around your surveying and engineering schedule
  • No debris hauling = lower costs and faster timelines

How It Works

Simple process for solar developers and EPCs

1

Share Site Plans

Send us your site layout, acreage, and timeline requirements. We'll review satellite imagery and provide a clearing estimate within 24 hours.

2

We Clear the Site

Our mulchers clear vegetation, brush, and small trees. We establish access roads and staging areas. Everything is ground into mulch on-site.

3

Installation Ready

Your site is cleared and ready for racking installation, surveying, or grading. No debris piles, no hauling delays, no surprises.

Solar Site Prep Services

Comprehensive clearing for ground-mount solar installations

Array Field Clearing

Clear the entire panel installation area of brush, saplings, and overgrowth

Access Road Construction

Clear and establish roads for equipment delivery, installation crews, and maintenance access

Equipment Staging Areas

Create cleared areas for panel storage, equipment parking, and installation staging

Perimeter Clearing

Clear fence lines and perimeter areas for security fencing and setback requirements

Inverter Pad Locations

Clear and prep areas for inverter pads, transformers, and electrical equipment

Vegetation Management

Ongoing maintenance contracts to prevent regrowth and shading issues post-installation

Why Solar Developers Choose Us

We understand the solar industry's unique site prep requirements

Forestry mulcher clearing land for solar installation

Timeline-Driven

We understand interconnection deadlines. Your schedule drives our schedule.

Documentation Ready

Before/after photos, GPS coordinates, and completion reports for your project files.

Erosion Control

Mulch layer left behind prevents erosion and meets NPDES stormwater requirements.

Fully Insured

$2M liability coverage. COIs provided for your project requirements.

Ongoing Maintenance

Post-installation vegetation management to prevent shading and maintain access.

Solar Projects We Support

From small commercial arrays to utility-scale farms

Residential Ground-Mount

Backyard and small acreage arrays for homeowners. Clear the footprint and access path.

Commercial & Agricultural

1-20 acre installations for businesses, farms, and community solar. Full site prep with access roads.

Utility-Scale Projects

Large-scale solar farms. Phased clearing to match your construction schedule and interconnection timeline.

Questions Solar Developers Ask

Quick answers for solar contractors and EPCs

How quickly can you clear a solar farm site?

Most 5-10 acre solar sites can be cleared in 2-5 days depending on vegetation density. Larger utility-scale projects are quoted per phase. We work with your interconnection timeline to ensure clearing doesn't delay your project.

What size trees can you mulch for solar sites?

Our forestry mulchers handle trees up to 8 inches in diameter. For sites with larger timber, we coordinate with logging crews first, then handle the brush, stumps, and remaining vegetation.

Do you work with solar EPCs and developers?

Yes. We regularly partner with solar EPCs, developers, and installers throughout Ohio and Kentucky. We understand interconnection deadlines, can work around surveying schedules, and provide the documentation you need for site compliance.

Can you create access roads for solar equipment?

Absolutely. We clear and establish access roads wide enough for panel delivery trucks and installation equipment. We can also clear equipment staging areas and turnaround zones.

What about ongoing vegetation management after installation?

We offer maintenance contracts for ongoing vegetation management around installed arrays. Many solar operators schedule annual or bi-annual clearing to prevent shading issues and maintain equipment access.

Ready to Clear Your Solar Site?

Send us your site plans and we'll have a clearing estimate back within 24 hours. We work on your timeline.